Projects executed by Opema
Below is a sample of our projects
1.- STRUCTURE PUSHES IN EUROPE
WORKS OF THE MINISTRY OF DEVELOPMENT:
- Thrust of the Underpass for the Work “Local Improvement. Construction of Underpass located in CN – 625from León to Santander via Cangas de Onís PK 60,200 Section: Sorriba del Esla (León)”.
- Thrust of the Underpass for the Work “Removal of Level Crossings in the Galician Railway Network. City Hall of Outerio de Rei (Lugo)”.
- Thrust of 3 Underpasses for the Work “Línea Málaga – Fuengirola. Improvement of accesses to Malaga Airport. T/ Camp Benítez – Benalmádena (Málaga)”.
- Push for the Elimination of Level Crossings in the Galician Railway Network. Monforte – Vigo line (PK 140/170) and Guillarei – Tui line (PK 1/891 and 2/913) Tui mt (Pontevedra) file number: 200410120.
- Push for three Underpasses for the High-Speed Northeast Corridor of the Teruel – Zaragoza line.Cariñena – Muel section.
- Push for the Underpass at PK 159+420 for the suppression of the level crossing at PK 159+353 of the Monforte – Vigo line in the municipality of Mos (Pontevedra).
- Underpass thrust at PK 100+000 of the Santiago – La Coruña line in the municipality ofSantiago de Compostela (La Coruna).
- Underpass thrust at PK 59+620 of the Castejón – Bilbao line in the municipality of Arrúbal(The Rioja).
- Underpass thrust at PK 438+638 of the Palencia – La Coruña line in the municipality ofLugo.
- Elimination of Level Crossings on the Galician Railway Network, Palencia –A Coruña PP.KK line. 449/420,449/947, 450/080, 450/779, 451/292, 453/013, 453/459, 454/158 and 454/842 in the municipality of Begonte (Lugo).
- Underpass thrust at PK 150/030 of the Madrid – Cuenca line in the municipality of Cuenca.
- Elimination of Level Crossing at PK 224+525 and expansion of structure capacity at PK 225+895of the Madrid – Seville line in the municipality of Valdepeñas (Ciudad Real).
- Atlantic high-speed hub. Section: Uxes – Pocomaco (A Coruña).
- Project for a passage under the railway at PK 169+063 of the Palencia – La Coruña line in the municipality of San Justo de la Vega (León).
- Project for a passage under the railway at PK 10+200 of the Figueras variant of the Barcelona line –Port Bou in the municipality of Vilamalla (Gerona).
- Project for the passage under the railway at KP 203+505 of the Pontevedra – Vigo line in the municipality of Redondela (Vigo).
- Project for the passage under the railway at PK 0+193.78 of the Redondela – Santiago line in the terminusmunicipality of Catoira (Pontevedra).
- Project for a passage under the railway at PK 331/058 of the Zaragoza-Barcelona line via LLeida, betweenthe Terrasa and Sant Miquel de Gonteres stations (Viladecavalls).
WORKS OF THE MINISTRY OF THE ENVIRONMENT:
- Push for the Underpass for the modification of the project to extend the channeling of the Carraixet ravine, section between Betera and the siphon of the Rascaña canal (Valencia). Phase I
WORKS FOR SPANISH RAILWAY ENTITY:
- Thrust of the underpass in Oza de los Ríos (La Coruña) on PK 518/481, of the Palencia – La Coruña line.
- Push of the underpass of the work for the suppression of the level crossing in PK 460/760 of the Madrid line
– Hendaye, in the municipality of Miranda de Ebro (Burgos). - Thrust of the underpasses in the PPKK. 14/207 and 14/614 for the suppression of the PP.NN. of the PP.KK.13/855 and 14/707 in Salteras (Seville), Seville – Huelva Line.
- Thrust of the Underpass of the Work “Inferior Passage at PK 0/635 FF.CC. Xativa – Alcoy”, in Xativa.
- Push for 3 Underpasses of the work for the Suppression of Level Crossings of the Palencia-La Coruña line,Municipal District of Cesuras (La Coruña).
- Thrust of the Underpass of the Work for Suppression of Level Crossing in Aliseda (Cáceres) of the Madrid Line – Valencia de Alcantara.
- El Paso push under the railway at PK48/223 of the Madrid – Valencia de Alcántara line. FinishedMunicipality of Yuncler (Toledo).
- Push for the Underpass at PK 15/825 and link roads for the Suppression of the Level Crossings of the PP.KK. 15/971 and 16/527 of the Aranjuez – Cuenca – Utiel line. Municipal District of Ocaña (Toledo).
- Push for the Underpass at PK 15/825 and link roads for the Suppression of the Level Crossings of the PP.KK. 15/971 and 16/527 of the Aranjuez – Cuenca – Utiel line. Municipal District of Ocaña (Toledo).
- Underpass push for the Railway at PK 253/069 of the Calatayud – Valencia line, in the municipality of Alfara de Algimia (Valencia).
- Thrust of Underpass of the Railroad in the PK 357/444 for the Elimination of the Level Crossing of the PK 357/446of the Palencia – La Coruña line, municipality of Monforte de Lemos (Lugo).
- Push for the Underpass of the Railway at PK 342/822.56 for the Elimination of the Level Crossing at PK 342/795 of the Palencia – La Coruña line. Municipal district of Quiroga (Lugo).
- Push for the Permeabilization Construction Project of the RENFE la Encina – Valencia line, inCatarroja (Valencia). Phase 2: Underpass for vehicular traffic.
- Thrust of Underpass for the work Connection A-52 with the Polígono San Cibrao das Viñas. Section N-525 /Street 1.
- Push for 2 underpasses for the construction project for the suppression of the level crossings of themunicipalities of Villagonzalo and Don Álvaro (Badajoz). Madrid-Badajoz line.
- Thrust of the Lower Passage at PK 426/858 of the Santiago – La Coruña line in the municipality ofCerceda (La Coruna).
- Push Paso Inferior at PK 12+160,140 of the Redondela – Santiago line in the municipality ofVillagarcia de Arousa (Pontevedra).
- Push for the Underpass Construction Project at PK 116/300 of the N-630 road, for the suppression of the PP.NN. of the PP.KK. 28/032, 28/795 and 29/437 of the León – Gijón Line. Pola de Gordon(Lion).
- Push for Underpass at PK 385/925 for the removal of the level crossing at PK: 386/067 of the lineMadrid – Badajoz, municipality of Magacela (Badajoz).
- Push for Underpass at PK 41/206 and connection paths for the suppression of Level Crossingsthe PP.KK. 40/830 and 41/384 of the Córdoba – Málaga railway line. Municipal District of Montilla (Córdoba).
- Thrust of Underpass at PK 68/706 for the Elimination of the Level Crossing of PK 68/723 of the lineBobadilla-Algeciras. Municipal district of Ronda (Málaga).
- Push for Underpass at PK 507/061 for the Elimination of Level Crossings of the PP.KK. 505/670,507/022 and 507/713 of the Madrid – Barcelona line in the municipality of Riba-Roja del Ebre (Tarragona).
- Project for a passage under the railway at PK 0+657 of the Picamoixons- Roda de Bará line in the terminusmunicipality of Roda de Bará.
- Project for the construction of the underpass at PK 413/313 and link road for the suppression of the PP.NN. of the PP.KK. 413/081 and 413/700 of the Madrid – Barcelona line. Municipality of Puebla deHijar (Teruel).
- Project for the passage under the railway at PK 527+829 of the Palencia – La Coruña line in the municipality of Bergondo (La Coruña).
- Project for the passage under the railway at PK 542/170 of the Palencia – La Coruña line in the municipality of Culleredo (La Coruña).
- Project for the passage under the railway at KP 263+049 of the Barcelona – Valencia line in the municipality of Salou (Tarragona).
- Project for a passage under the railway at the Montcada i Reixac Sta. María suburban station on the lineBarcelona – Manresa in the municipality of Montcada i Reixac (Barcelona).
- Project for a passage under the railway at PK 656+700 of the Madrid – Barcelona line in the municipality of Castelldefels (Barcelona).
- HSL Madrid – Levante. Arterial railway network of Valencia, Phase I access channel to Valencia.
- Project for a passage under the railway at KP 466+950 of the Venta de Baños – Santander line in the municipality of Arenas de Iguña.
- Project for a passage under the railway at PK 68+691 of the Madrid – Barcelona line in the municipality of Yunquera de Henares (Guadalajara).
- Project for a passage under the railway at KP 511+503 of the Madrid – Hendaya line in Ezquerecocha,municipality of Iruraiz – Gauna (Álava).
- Project for a passage under the railway at Montgat Nord Station.
- Project for a passage under the railway at KP 413+496 of the Madrid – Valencia de Alcántara line in the municipality of Valencia de Alcántara (Cáceres).
- Project for a passage under the railway at PK 148+650 of the Madrid-Seville and Madrid-Alicante linesin the municipality of Alcázar de San Juan (Ciudad Real).
- Project for a passage under the railway at PK 0+970 of the Ourense – Santiago axis. Section: Station AccessOurense.
- Project for a passage under the railway at PK 1+120 of the Ourense – Santiago axis. Section: Station AccessOurense.
- Project for a passage under the railway at PK 2+140 of the Ourense – Santiago axis. Section: Station AccessOurense.
- Project for a passage under the railway at PK 2+140 of the Ourense – Santiago axis. Section: Station AccessOurense.
- Project for a passage under the railway at PK 96+564 of the Xátiva – Valencia line. Connection branch viaright. Municipal district of Almussafes (Valencia).
- Project for a passage under the railway at KP 239+249 of the Madrid – Hendaye line in the municipality of Valladolid.
- Project for a passage under the railway at PK 108 + 420 of the High Speed line Madrid – Seville inthe municipal term of Getafe (Madrid).
- Surveying of the track at PK 32+898 between turnoffs No. 2 and No. 4 of the Santaella PAET.
- Project for a passage under the railway at KP 3+246.66 of the AV Madrid – Seville line in the terminus municipality of Torrejón de Velasco (Madrid).
- Project for a passage under the railway at KP 3+532.614 of the AV Madrid – Seville line in the terminusmunicipality of Torrejón de Velasco (Madrid).
- Project for a passage under the railway at KP 3+532.614 of the AV Madrid – Seville line in the terminusmunicipality of Torrejón de Velasco (Madrid).
- Project for a passage under the railway at KP 32+927 of the AV Madrid – Sevilla line in the municipality of Torrejón de Velasco (Madrid).
- Project for a passage under the railway at PK 306+208 of the AV Madrid – Sevilla line in the municipality of Parla (Madrid).
- Track surveying at 60 km/h for pipe jacking at PK 200+344,476 of the AV Madrid – Sevilla line in the municipality of Getafe (Madrid).
- Track surveying at 60 km/h for pipe jacking at PK 205+539 of the AV Madrid – Sevilla line in the municipality of Getafe (Madrid).
- Project for a passage under the railway on the R-4 Barcelona – Manresa – Lleida line in the municipal districtof Viladecavalls (Barcelona).
- Railroad Underpass Project At Pk 22+679 of the Via Par Del Ramal From Castellbisbal to Mollet/li>
- Railroad Underpass Project at PK 654+272 of the Barcelona – Tarragona Line. Municipal District of Sitges (Barcelona).
- Execution works of the Construction Project for the implementation of the standard gauge in the Mediterranean Corridor. Section: Castellbisbal-Mucia. Subsection: Font de Sant Lluis-Almussafes. Track and electrification.
- Underpass Project on Line R-4 Barcelona-Manresa-Lleida. Viladecavalls station. Municipal District of Viladecavalls (Barcelona).
- Platform Construction Project. North-Northwest High Speed Corridor. Madrid-Galicia High Speed Line. Section: Requejo – Padornelo Tunnel.
- Railroad Underpass Project at KP 123+579 of the Medina Del Campo – A Coruña Line. Municipal District of Requejo de Sanabria (Zamora).
- Underpass Project for the Railway on the Málaga – Fuengirola Commuter Line. Municipal District of Fuengirola (Málaga).
- Project for the Execution of the Underpass between Platforms and Installation of Lifts at the Lezo – Errentería Station. Municipal Term of Lezo (Guipúzcoa).
- Underpass Project at Andoain Station (Guipúzcoa). Municipal area of Andoain (Guipúzcoa).
- Underpass Project at Urnieta Station (Guipúzcoa). Municipal District of Urnieta (Guipúzcoa).
- Underpass Construction Project on the Barcelona – Puigcerda Railway Line. Municipal District of Granollers.
- Underpass Project for the Railway at PK 533+734 of the Palencia – La Coruña Line. Municipal District of Cambre (A Coruña).
- Underpass Project for the Railway at KP 535+839 of the Palencia – La Coruña Line, Municipal District of Cambre (A Coruña).
- Pedestrian access to Polígono de Pocomaco from El Birloque (A Coruña).
WORKS NARROW GAUGE RAILWAY:
- Thrust of the Underpass for the Work “Deletion of the Level Crossing located at PK 45+593 of Line 1in Benifaió (Valencia)”.
- Push for the underpass of the work for the suppression of the PC-5 level crossing at PK 36+368 of the lineof FGV Valencia-Villanueva de Castellón, in the municipality of Picassent (Valencia).
- Underpass Thrust for the Permeabilization of the North Museros Zone Railway (Valencia).
- Thrust of the Underpass for the Elimination of the Level Crossing at KP 3+928 of the FGV Lliria – Valencia line at the intersection with the VV-6106 road from Benaguasil to L’Eliana, municipality of Benaguasil.
- Elimination of the Level Crossing at PK 08+133 of FGV line 1 in Pobla de Vallbona.
- Elimination of Level Crossing ME-1 of line 3 of FGV in Meliana (Valencia).
- Underpass Project at De Xeraco Station (Phase II). Municipal District of Xeraco (Valencia)
FGC WORKS:
- Thrust of the underpass of the work “Para Tancament i Millora de la Comunicacio entre platforms a la Estacióthe Palau dels FGC”.
- Push for the Lower Passage at PK 18/940 of the FGC Barcelona – Igualada line in the municipality of Piera (Barcelona).
ADIF RAM WORKS:
- Push for Paso Inferior at PK 112+160 in Burela (Lugo)
- Underpass Push for the Elimination of Level Crossings at PK 130/678 of the FF.CC. Leon-Valmaseda.Municipal term of Cervera de Pisuerga.
- Underpass Project with lifts and raised platforms at the Ram de Bezana Station. Municipal District of Bezana (Cantabria).
- ADIF-RAM track maintenance in Northwest Spain
WORKS OF THE GOVERNMENT OF CASTILLA Y LEÓN:
- Push for the Access Improvement work. Location: C-605 from Segovia to Zamora via Arévalo. Section:access to Arévalo PK 57,053 – 57,700.
WORKS OF THE RAILWAY INFRASTRUCTURE MANAGER (GIF):
- Underpass thrust for the New Viaduct work on the current Railway Line in the municipality of Sant Celoni.
WORKS DEPARTMENT OF PUBLIC WORKS AND TRANSPORT JUNTA DE ANDALUCIA:
- Project for the passage under the railway at PK 69+200 of the Bobadilla – Algeciras line in the municipality of Ronda (Málaga).
- Project for a passage under the railway at PK 15+327 of line 1 of the Seville metro with Alcalá de Guadaíra. Section I: Pablo de Olavide University – Adufe in the municipality of Dos Hermanas (Seville).
WORKS OF THE GENERALITAT OF CATALONIA:
- Underpass thrust at PK 26+450 of the Barcelona – Martorell line in the municipality of Martorell (Barcelona).
- Construction Project. unfolding C-14 highway. Tram: Reus – Alcover.
- Underpass Project at KP 55+480 of the Barcelona – France line in the municipality of SantCeloni (Barcelona).
PROJECTS OF THE NAVARRE PROVINCIAL COUNCIL:
- Project for the construction of the sections of the Arzabalza – Tolosa and Atlzo Azpi – Alegia bicycle-pedestrian lane,(2nd phase).
VITORIA CITY COUNCIL WORKS:
- Push of Paso Bajo el Ferrocarril at PK 494/665 of the Madrid – Hendaye line in sectors 11 and 13 of thePGOU, in the municipality of Salburua (Vitoria).
SITGES CITY COUNCIL WORKS:
- Underpass Push for the Railway at KP 654+272 of the Barcelona-Tarragona line. Municipalityof Sitges (Barcelona).
WORKS OF THE MINISTRY OF INFRASTRUCTURES AND TRANSPORT:
- Thrust Expansion of Underpass Under the Valencia – Zaragoza Railway, Northern Access to Segorbe fromthe CV-200. Segorbe.
- Project for the passage under the railway at PK 238+250 of the Valencia – Zaragoza line in the municipality of Segorbe (Castellón).
MANAGER OF TRANSPORT AND PORTS OF THE GENERALITAT VALENCIANA:
- Project for a passage under the railway at KP 446+580 of the Madrid-Alicante line in the municipality of Sant Vicente del Raspeig (Alicante).
PARTICULAR WORKS:
- Thrust of Underpass Under the Railway at PK 4+940 of the León-Gijón line. Municipal term ofSan Andres del Rabanedo (Leon).
- Construction and thrust of Paso Inferior at PK 43/722 of the Madrid – Alicante line in the municipality of Seseña (Toledo).
- Urbanization project of the planning sector No. 1 of the urban action program of the sunp.bm-3 in Malaga. Crossing under the railway tracks of the rainwater evacuation system No. 1 at KP 10+889 of the C1 Málaga – Fuengirola railway line.
- Project of passage under the railway in the KP: 168+723 of the Madrid – Gijón line in the municipal areaGijon (Asturias).
- Expansion and remodeling of the Aluche interchange. Remodeling of the square and intersections.
- Project for the passage under the railway at PK 2+658 of the Ferrol – Gijón line in the municipality of Narón (A Coruña).
- Project for a passage under the railway at PK 517+389 of the Madrid – Barcelona line. Channeling ofPotxos ravine. Ascó Nuclear Power Plant. Municipal district of Ascó (Tarragona).
- Connection of the collector of the South zone (El Carrascal), 2nd phase and its incorporation to the treatment plant ofsewage water. Valladolid.
- Channeling of the Potxos ravine of the Ascó nuclear power plant.
WORKS OUTSIDE EUROPE:
- Underpass Project for the railway at Km 696.189 of the South Central Line, Padre De Las Casas Beltway – Temuco. Municipal Term of Commune of the Houses, Temuco (Chile).
- Villa Alegre underpass.Improvement of the Temuco Padre las Casas road interconnection, Araucania Region (Chile).
2.- RAILWAY TRACK WORKS
- Elimination of Level Crossing at PK 37+388 of Line 1 of FGV in Picassent (Valencia).
- Elimination of Level Crossing in Puebla de Hijar (Teruel).
- Apeo under the Feve Railway. Municipal District of Aguilar de Campoo (Palencia).
- Track surveying under the FFCC in the Port of Gijón (Asturias).
- Underpass Bajo Feve on the road to Regosanguento. Xove.
- Surveying of Tracks in the Barranco de Quartell Project.
- Track Shoring for Drainage Works on the High-Speed Line. Section: Linares – C. Torrubia
- Platform for the Expansion from 2 to 4 Tracks on the High Speed Lines between Madrid (Atocha) and Torrejón de Velasco. Section: Getafe – Pinto.
- Assembly of Slab Track within the Work: Expansion of the Talgo Patent Factory in Rivabellosa – Ribera Baja (Álava).
- Track surveying inside for the ODT Drainage Work – 506.38 in the Porto – Miamán Section (Ourense).
- Track Assembly in the Porto – Miamán Section (Ourense).
- Track assembly in Gudiña for the Ave to Galicia. Section Puebla de Sanabria – Ourense.
- Assembly of Track in the Work: Puerto del Musel in Gijón. Feve.
- Platform stabilization and new drainage works at PK 444/150 of the Ferrol – Bilbao Line at the Pendueles Station.
- Track works at the Apeadero de la Aguda (Asturias) for RAM.
- Assembly of Slab Track within the Conditioning, Pit and Cover Project next to the Painting Warehouse in BM in Lugo Llanera.
- Welding and Stress Release on the AVE in Zamora.
- Assembly of 720 Ml of Slab Track in the Port of Avilés.
- Welding in the Madrid Metro.
- Track Works on the New Railway Line in Torrejón de Ardoz – Phase 1.
- Surveying of Tracks on the Ferrol – Bilbao Line. Pola de Siero – Nava section. Phase 1: Elimination of Level Crossings.
- Track surveying within the New Montequinto Spillway Collector Project, between Canal del Bajo Guadalquivir and Río Guadaíra, between Dos Hermanas and Seville.
- Surveying of the Track within the Construction Project for the Remodeling of the Granada Track Bundle and Adaptation of the Antequera – Granada High-Speed Station.
- Surveying of Roads for the Rainwater Collector in Doctor Machí Street and Phase II Circunvalación in Paterna (Valencia).
- Surveying Under the Railway Track of the Vigo – Santiago Line at PK 25/520. Municipal Term of Pontevedra.
- Track welding within the Track Rehabilitation Project with a 45 kg rail on a bi-block sleeper, in pairs of 2nd use on a 45 kg rail sleeper, on a mono-block sleeper between kms 72/700 and 75/800. Osuna-Pedrera Project. Utrera to Fuentepiedra Bifurcation Line.
- Surveying 10 meters long under the Railway Track of the Barcelona – Manresa – Lleida Line, Municipal District of Monjos.
- Track surveying for 1,500 diameter pipe jacking on the Madrid – Ávila Line. TM of Santa Maria de Alameda.
- Surveying Under the Railway at PK 162+738 of the Castejón – Bilbao, Subijana – Morillas Line. Municipal District of Vitoria (Álava).
- Works on Track within the Replacement of RSP Sleepers by Monobloc between Quintana and Astorga. Line León – La Coruña.
- Track Works for the Puerto Ferrol Sanitation Network.
- Substitution Work for the Drainage Work on the Medina del Campo – Salamanca Line at Pedroso/ Cantalpino, PK 50+500.
- Track surveying within the Piping Jacking Execution Project for the Seville – Huelva railway line crossing. Road A5000, Km 7.5, Huelva.
- Track surveying within the Integration of the Railway in the city of León.
- Track Maintenance Works at the facilities of the Tudela Veguin Cement Plant in Aboño (Asturias).
3.- RAIL DRIVING
- Piling of Rails in the Passage Under the Railway in Xove.
- Piling of Rails in Aranga on the León – A Coruña Line.
- Rail Piling in Santas Martas.
- Rail Piling to Protect the Track from Planned Actions on the Foundation of an Overpass Close to the High-Speed Track of the Grañena – Jaén Section.
- Rail Piling in the Expansion of the Finsa Orember Facilities (Orense).
- Execution of Micropiles and Driving of Railway Rails for the Underpass Execution Works between Platforms and Installation of Lifts in the Andoain and Urnieta Stations (Gipuzkoa), Lots II and IV, Work No. 5318032, Ref. Tsa0066197.
- Piling of Rails within the Renovation of the Route Algeciras – Almoraima.
- Piling of Rails in N-330 Huesca.
- Piling of Rails within the Integration of the Railway in the city of León.
- Piling of Rails in the Pajares Bypass in the Calle la Estación de Campo and Santibañez (León).
4.- PUBLIC WORKS
- Painting of Facades in the Babilafuente Station, cleaning of the Circulation Cabinet in Pola de Gordón, cleaning of the Circulation Cabinet in Porqueros, painting of the facades in the Brañuelas Station.
- Demolition and conditioning of facades in Toro (Zamora).
- Rehabilitation of Facades and Platforms at the Villamanín Station.
- Painting of the Structure of the Marquee of Villada (Palencia).
- Construction of a Pedestrian Underpass between platforms at the Villada Station, Palencia – La Coruña Line.
- Rising of Platforms at the Barrientos Station.
- Rising of platforms at the Busdongo station.
- Rising of Platforms at the Burgo Ranero Station.
- Rising of Platforms in Sobradelo.
- Rising of Andenes in Becerril.
- Demolition of the San Martín del Camino Railway Station.
- Project for Platform Repair and Installation of Canopy at the Otero de Escarpizo Halt.
- Installation of Proximity Bands, Replacement of the Roof of the Annex Building and Cleaning of the Surroundings in the Santa Lucía Station.
- Rehabilitation of the Old Rectory for Wake Use in Torneros de la Valdería. Castrocontrigo
- Electrical Substation in Ba Vidirio León.
- Repair of Platform Lighting at the Santas Martas Station (León).
- Works Motivated by Damage to the Infrastructure Produced by the Effects of the Storm of January and February 2014 in the Trenches Included between Pk. 488/000 – 495/200 of the Unquera – Santander Line of the Metric Gauge Network.
- 20KV Power Line Power New Compact Surface Transformation Center with Exterior Maneuver “Valdeiglesia” and Low Voltage Network, Urbanization and Irrigation within the Fundación Cerezales Antonino y Cinia in Cerezales del Condado (León).
- Reform works of the Old Renfe Commissary, in Calle Astorga de León.
5.- BUILDING AND PROMOTION
- Construction of a Functional Building at the Barrientos Station.
- Construction of a Functional Building at the Vega Magaz Station.
- Construction of the Building for the Town Hall of Gradefes. Lion.
- Construction of a building in Santa Olaja de Eslonza (León).
- Promotion and construction of 22 homes in the León building.
- Promotion and construction of 43 homes in the León building.
- Promotion and construction of 15 terraced houses in León.